Battersea Power Station — district energy
A district energy benchmark supporting a dense mixed-use London redevelopment.
Relationship to VOLA
This is an external reference benchmark. VOLA CAPITAL does not claim ownership, development, management, advisory involvement or affiliation with the project or organisations named.
Wikimedia Commons — amandabhslater (CC BY-SA 2.0)
Overview
A district energy benchmark supporting a dense mixed-use London redevelopment.
Why the case matters
This case is retained in the RC0 library to illustrate governance, delivery and disclosure standards. Relationship and evidence status are stated explicitly.
Technical parameters
- CHP engines, boilers, chillers and thermal storage serving 42-acre site
- GBA / scale: Approx. 73,000 sq ft basement energy centre (Vital Energi case study)
- Delivery model: District energy centre (operate)
- Access: Northern Line: Battersea Power Station
Sources
Release blockers
No release blockers recorded.
Related cases

22 Bishopsgate
A high-density London commercial tower used as a benchmark for premium workplace infrastructure.

ALICE × HITT Contracting
A construction simulation benchmark for sequencing, alternatives analysis and delivery optimisation.

Antarès
A residential turnaround benchmark for upgrading social housing into a higher-performing asset.